Overview
- Project
- Réseau Express Régional (RER) E also known as the Est Ouest Liaison Express or EOLE, which translates to East West Express Link
- Commenced in 2018 and expected to be completed by 2022
- Fifth RER line serving Paris and its suburbs
- Expansion of Line E westwards by 55km from its existing terminus in the Haussmann-Saint-Lazare railway station to the Nanterre La Folie station
- Includes the development of new tracks, 8km-long tunnel section between Haussman Saint-Lazare and Mantes-la-Jolie stations, 6.1 km tunnel under the Siene river
- Construction of three new stations at Porte-Maillot, La Défense-CNIT, and Nanterre-la-Folie
- Aims to improve service and connectivity to Paris for commuters of the Île-de-France region with increased frequency, speed and regularity of trains while optimising the use of infrastructure
- Designed to serve over 620,000 passengers daily with approximately 28 trains running per hour
- Goals
- Streamline and automate site processes
- Digitise paper processes to reduce time spent on completing, submitting, and managing paperwork
- Implement a single construction quality management software to enforce high standards and monitor the rail infrastructure project
- Deploy a solution which caters to the different needs on the large-scale railway project
- Challenges
- 400-500 workers on two sites: Gambetta and Porte Maillot stations
- Massive amount of time spent on completing paperwork, gaining approvals from superiors, and travelling from site to office for data submission
- Minimal real-time monitoring of on-site progress due to manual recording and duplicated data
- Lack of traceability for quality-related tasks
- Contractors
- A joint venture between Eiffage Génie Civil, Bouygues Travaux Publics, and Razel-Bec
- Solutions
- Novade Quality
- Novade Activity
- Outcomes
- Improved speed and efficiency with administrative work completed autonomously on-site
- 8,000 forms completed and submitted using mobile devices in real time
- By scanning QR codes, teams receive immediate notifications with details on concrete type and use
- Novade’s single site management platform seamlessly syncs documentation, BIM system, and 3D plans
- Improved visibility on site processes in real time as supervisors receive daily progress reports with visual representations
- Enhanced traceability for project directors who can easily access all controls conducted and keep track of project’s status
Watch the story
Connecting the Seine to Paris
At the centre of the Seine River basin lies Île-de-France – previously the cradle of the French monarchy, now a heartland of the metropolitan region. Recognising the connection gap, the French government decided to extend the Réseau Express Régional Eole (RER E) to the west.
A joint venture between Eiffage Génie Civil, Bouygues Travaux Publics, and Razel-Bec was appointed in 2017 to construct the new Porte Maillot station and to excavate a 6.1km tunnel under the Seine River. Eiffage Génie Civil commissioned a workforce of more than 400 workers to manage two sectors.
Eiffage Génie Civil is a trailblazer in the construction industry
Foreseeing the need to digitalise its site processes for better visibility and traceability in real time, Eiffage Génie Civil engaged Novade for its Quality and Activity modules.
Construction director Antoine Cumunel commented, “I wanted to replace processes that generate paper. Managing paperwork takes a long time, you have to go back to the office, you have to write, sign, and scan it.”
Wells installations and productions manager Giorgio Doglio also commented, “The advantages of the Novade application are the speed, efficiency, usefulness, and that you can work independently without going to the central office.”

Enhance control with technology
Enforcing control measures has traditionally been a manual task for teams to manage on-site. Works engineer Mathieu Roboam shared that even on just one site, he had to manage up to four different concrete formulations with different uses. Leveraging a construction tracking software simplified matters tremendously.
Furthermore, the Novade digital construction app synced seamlessly with their documentation, BIM system and 3D plan. Roboam said, “Within two to three months of use, we managed to have a tool which totally corresponded to our needs.”

Empower workers with digitalisation
The advent of technology in the construction industry had been a long time coming. Digitalisation has made a large impact on day-to-day operations. Processes get streamlined and automated, human errors and duplicate labour get reduced, and workers are empowered to perform more efficiently and effectively.

What they say
“For me, the level of control has been strengthened. We found a tool that corresponded with all our needs.”
“Novade’s deployment was surprisingly simple. It will not do our jobs, but it saves us a lot of time to help us do our jobs better.”